You will wonder that your cars will be run by water instead of petrol or diesel. Shree Ratan TATA has announced to make a car, driven by water. Hydrogen the future fuel for automobiles is derived from water by electrolysis process with help of solar panels. One cubic meter (at NTP) of hydrogen would require 3.266 KWh of DC electric energy. Three cubic meter (at NTP) of hydrogen will provide as much power as one liter diesel to your vehicle.
Decade ago we heard that cars will be run by water. The fossil fuels like diesel, gas and petrol will be replaced by water. This surprise is possible in now a day. The hydrogen is separated from water by electrolysis process with the help of solar panels.

Monday, November 26, 2012

Rate list for 1Kw to 100Kw roof top solar pv



Solar PV Power Plant without Battery Bank
Sno.      Product Name    Rate       Net value  after
                                                        30% subsidy inRs.                                                          
1                 1KWp         1,50,000    1,05,000
2                 2KWp         3,00,000    2,10,000
3                 5KWp         7,50,000    5,25,000
4                 10KWp       15,00,000  10,50,000
5                 25KWp       37,50,000  26,25,000
6                 50KWp       70,00,000  49,00,000
7                 100KWp    1,40,00,00098,00,000
Solar PV Power Plant with Battery Bank
1                 1KWp         2,20,000    1,54,000
2                 2KWp         4,20,000    2,94,000
3                 5KWp         10,00,000  7,00,000
4                 10KWp       19,00,000  13,30,000
5                 25KWp       46,25,000  32,37,500
6                 50KWp       90,00,000  63,00,000
7                 100KWp    1,75,00,0001,22,50,000
Terms & Conditions: Rates mentioned above are indicative and may vary with exact requirements of the customer & detailed engineering. We charge only 70% from customer( Net value only). The customer has to issue us a letter of Intent(LoI). We send this proposal to MNRE www.mnre.gov.inat Delhi for sanction. After sanctioned from MNRE we charge advance 20% with confirmed P.O from customer. 70% after supply of complete material at site. 10% after installation and handover.